EDC Logo
LIBYAN PORTS

Benghazi Port

  • LOA/Beam/Draft = 300m/Any/10.00m
  • Average discharging rate is 3000mt/day depending on receiver and if WP
  • Port working hours is from 07:00 to 23:00 LT (Pilot in-Pilot out)
  • Stevedoring working hours is 24hrs/7days
  • Port congestion is expectedly minimal for the early months of this year.
  • Method of discharging is either done by shore crane, grabs or vacs

Tripoli Port

  • LOA/Beam/Draft = 200m/Any/10.00m
  • Stevedoring working hours 24hrs/7days
  • Port working hours from 07:00-22:00 hrs (Pilot in-Pilot out)
  • Method of discharging is either shore cranes, grabs or vacs
  • Average discharging rate is 1500mt/day

Misurata Port

  • LOA/Beam/Draft = 300m/Any/10.00m
  • Stevedoring working hours from 08:00-22:00hrs
  • Port working hours from 07:00-22:00hrs (Pilot in-Pilot out)
  • Average discharging rate is 1500mt/day
  • Method of discharging is either shore cranes, grabs or vacs

Khoms Port

  • LOA/Beam/Draft = 300m/Any/10.00m
  • Stevedoring working hours 24hrs/7days
  • Port working hours from 07:00-22:00 hrs (Pilot in-Pilot out)
  • Method of discharging is either shore cranes, grabs or vacs
  • There are 2 port cranes available with maximum capacity of 60 tons and 100 tons respectively.

Tobruk Port

  • LOA/Beam/Draft = 200m/Any/8.50m
  • Stevedoring working hours 24hrs/7days
  • Port working hours from 07:00-22:00 hrs (Pilot in-Pilot out)
  • Method of discharging by normal hook or wire sling or chain sling.

Brega Port

  • LOA/Beam/Draft = Satisfactory/Any/9.20m
  • Stevedoring working hours 24hrs/7days
  • Average discharging rate is 500-600mt/day
  • Port working hours from 07:00-22:00 hrs (Pilot in-Pilot out)

Derna Port

  • LOA/Beam/Draft = 360m/Any/8.25m
  • Stevedoring working hours 24hrs/7days
  • Port working hours from 07:00-22:00 hrs (Pilot in-Pilot out)